Home » Ferguson » Recent Articles:

Significantly Reducing Access Points To Public Transit Isn’t Fair, Just, or Equitable

In a guest piece in the St. Louis American 20th Ward Ald. Cara Spencer makes a passionate plea for expanding MetroLink light rail:

The St. Louis region needs a high-quality light rail system to connect Florissant/Ferguson and our densely populated South Side to Downtown and the Central Corridor. Now is the time to push for economic investment to help stabilize some of the city and county’s most vulnerable communities. We should be demanding that our local leaders prioritize North Side/South Side MetroLink expansion as imperative to making St. Louis a progressive and economically just metropolitan area.

Public transportation speaks volumes about a society. Lack of transportation is an indicator of economic injustice and is the number one deterrent to employment and community involvement across the country. (St. Louis American)

Would light rail be more “just”?  Those who don’t actually use public transit on a daily basis may think so, but the reality is the opposite.

Map currently being circulated
Map currently being circulated, click image to view larger PDF in Scribd.

The above map is from the North South MetroLink Expansion Facebook page.

Northside:

Currently to get from downtown (14th & Spruce) to Ferguson and the Florissant Valley Community College there are two options:

  1. #74 (Florissant) MetroBus is the most direct option. This takes 1 hour and 1 minute with up to 68 potential stops along the way.  That’s a long time, I’ve done it many times in the last year.
  2. MetroLink (Red) to Hanley Station plus #36 (Spanish Lake) MetroBus.  This option takes a total of 1 hour and 2 minutes. This route is 23 minutes on light rail with 10 stops, 10 minutes between modes, and 29 minutes on bus with up to 40 stops.  I’vc also done this a few times.
The two primary choices for getting from downtown to Florissant Valley CC
The two primary choices for getting from downtown to Florissant Valley CC, click image to view in Google Maps. Note that times may vary, just depends on when you depart.

The proposed light rail line would certainly cut this down to 30-45 minutes. That’s a good thing, right? Not necessarily.

Very few ride the #74 MetroBus end to end. It’s a busy bus route but people get on/off where they need to. With 68 points of access it serves the corridor well. More frequent headways would be better though.  The proposed light rail route would most certainly mean the #74 would end at a new Jennings Station MetroLink Station at Goodfellow & W. Florissant, rather than duplicate service from that point North. From Goodfellow & W. Florissant it currently takes 24 minutes to reach the community college at the end of the #74.  The light rail map floating around would instead have just 4 stops including the start & end stops! How is that just?

The proposed light rail has zero stops in the area of W. Florissant that most uses transit.
The proposed light rail has zero stops in the area of W. Florissant that most uses transit.

Sure a light rail train may be faster and be more frequent, but that’s little consolation if you’re walking a mile further in the rain to get to a limited access point. For many current riders they’d now just end up having to walk their entire trip. Unless we ran a bus on the same route as the light rail train, which kinda defeats the point of spending tens/hundreds of millions on light rail.

Southside:

A similar situation occurs along the proposed Southside route. Currently a person downtown (14th & Spruce) seeking to get to Cherokee & Jefferson using public transit has two choices, both via MetroBus: #11 & #73

How long does it take to get from 14th & Spruce to Cherokee & Jefferson on these two MetroBus routes?

  1. #73: 17 minutes, running every 30 minutes weekdays, with up to 18 points of access in that distance.
  2. #11: 16 minutes, running every 20 minutes weekdays, with up to 19 access points.

Both are pretty quick. The Southside light rail being pushed follows the #11 route exactly between these points so let’s take a closer look.  Google Maps includes the start & end stops in their 19 stop count. Here are the 17 access points in between:

  1. 14th St @ Papin SB
  2. Chouteau Ave @ 14th Street WB
  3. Chouteau Ave @ 18th Street WB
  4. Chouteau Ave @ Mississippi WB
  5. Chouteau Ave @ 22ND Street WB
  6. Jefferson Ave @ Chouteau SB
  7. Jefferson Ave @ Hickory SB
  8. Jefferson Ave @ Park SB
  9. Jefferson Ave @ 1605 S Jefferson SB
  10. Jefferson Ave @ Layfayette SB
  11. Jefferson Ave @ Russell SB
  12. Jefferson Ave @ Shenandoah SB
  13. Jefferson Ave @ Gravois SB
  14. Jefferson Ave @ Pestalozzi SB
  15. Jefferson Ave @ Arsenal SB
  16. Jefferson Ave @ Wyoming SB
  17. Jefferson Ave @ Utah SB

So how many stops would this “just” light rail make to serve the “densely populated South Side”? Five!

  1. Chouteau & Truman Parkway
  2. Jefferson & Park
  3. Jefferson & Russell
  4. Jefferson & Gravois
  5. Jefferson & Arsenal

The density isn’t concentrated at just 5 points! Only a person who doesn’t understand transit can ague that spending millions while reducing 17 access points to 5 is “fair, just and equitable.” For example, everyone who works & shops at Jefferson Commons would now have to walk further. Sorry folks, remember this is “just” as your grocery trips are longer.

Back to Ald. Spencer’s op-ed:

On the one hand, it is exciting to see renewed interest in light rail in St. Louis County. Yet on the other hand, it is alarming that the expansions mentioned did not include a north/south route, but instead focused on the Clayton-Westport, Lambert-Florissant and Shrewsbury-Butler Hill lines. These three lines fail to provide service to the region’s most densely populated areas and many communities that have the highest need. 

Northside/Southside light rail also fails to address actual needs — it would provide service for whites who are uncomfortable riding the bus with non-whites, see Race, Class, and the Stigma of Riding the Bus in America. You can have a free train running every 5 minutes 24/7 but if a person must walk a mile to reach a point of access they’re not going to use it. Stop pretending it benefits them.

Related prior post: Northside-Southside Light Rail Wouldn’t Be Good For St. Louis Neighborhoods

— Steve Patterson

 

 

 

Top-Down Auto-Centric Thinking Continues In Ferguson, Still Time To Change

We all know the phrase: “Don’t look a gift horse in the mouth.”  Those living in low-income areas, especially those of color, have been sent this message for decades: Mill Creek Valley, Pruitt-Igoe, etc. In other words, we know what’s best for you so just accept what we decide to give to you. In the near term the gifts seemed like a good idea, but in hindsight they were ill-conceived and corners were cut. Pruitt-Igoe:

As completed in 1955, Pruitt–Igoe consisted of 33 11-story apartment buildings on a 57-acre (23 ha) site, on St. Louis’s lower north side. The complex totaled 2,870 apartments, one of the largest in the country. The apartments were deliberately small, with undersized kitchen appliances. “Skip-stop” elevators stopped only at the first, fourth, seventh, and tenth floors, forcing residents to use stairs in an attempt to lessen congestion. The same “anchor floors” were equipped with large communal corridors, laundry rooms, communal rooms and garbage chutes.

Despite federal cost-cutting regulations, Pruitt–Igoe initially cost $36 million, 60% above national average for public housing. Conservatives attributed cost overruns to inflated unionized labor wages and the steamfitters union influence that led to installation of an expensive heating system; overruns on the heating system caused a chain of arbitrary cost cuts in other vital parts of the building.

Nevertheless, Pruitt–Igoe was initially seen as a breakthrough in urban renewal. Residents considered it to be “an oasis in the desert” compared to the extremely poor quality of housing they had occupied previously, and considered it to be safe. Some referred to the apartments as “poor man’s penthouses”.

Despite poor build quality, material suppliers cited Pruitt–Igoe in their advertisements, capitalizing on the national exposure of the project.

The people were expected to adapt to the solution, rather than the solution adapt to the people. Locally and nationally little has changed since the 1950s.

Early residents were thankful, those displaced not so much. Within a decade what had seemed like a great solution turned out to be an expensive nightmare. Most of the site remains vacant four decades after being cleared.

The players today are different — non-profits and the private sector in place of the federal government. The attitude, however, is the same: ‘we want to do something to help you — why should we ask for your input?’ The unintended consequences of the well-intentioned were huge. Eventually the federally government realized the folly of this way of thinking — changing to rules & regulations to require environmental impact studies, public input, etc. This is not to suggest these will avert all unintended consequences — they won’t — but the results are better than those designed in isolation. Which brings me to Ferguson.

As I wrote about a week ago two community plans intersect at former ferguson QuikTrip site. Rather than QuikTrip officials quietly talking with the St. Louis Urban League for six months I think they should’ve empowered the local residents by getting them involved in the process of determining what to do with the site. The Urban League’s slogan is “Empowering Communities. Changing Lives.”

This was an opportunity for Ferguson’s residents to have a say in their future — to have a seat at the table. Empowerment through engagement.

Rendering of the Empowerment Center of Ferguson shown on March 16, 2015
Rendering of the Empowerment Center of Ferguson shown on March 16, 2015

The speakers for their presentation was exclusively top-down players:

  • Michael P. McMillan President and CEO, Urban League of Metropolitan St. Louis
  • Michael Johnson Board of Directors, QuikTrip Corporation
  • Warner Baxter Chairman, President & CEO, Ameren
  • Patrick J. Sly Executive Vice President, Emerson
  • Thomas J. Irwin Executive Director, Civic Progress
  • Kathleen T. Osborn Executive Director, Regional Business Council
  • Susan Trautman Executive Director, Great Rivers Greenway
  • Steven Sullivan President and Executive Director, Provident

The proposed new building would be built in the same spot as the old QuikTrip — not up to the sidewalk to make the area more pedestrian-friendly as suggested by the Great Streets Initiative. Great Rivers Greenway said they’d hire some who complete the 4-week jobs 101 course to be Gateway Rangers to bike the North Riverfront Trail — the planned trail next to the site wasn’t mentioned.

Today’s buildings are more disposable than those build 100 year or more years ago, this QuikTrip opened in 1989 — it lasted 25 years until burned following the shooting of Michael Brown. As I said in the comments on Monday, the building had been fully depreciated. Yes, the St. Louis County Assessor still said it had value, but the business view is different — for tax purposes you want deductions: a facility you can depreciate or lease payments.

QuikTrip just razed their 2851 Gravois location built in 1991 — to be rebuilt. QuikTrip sold this property two years ago in a 15-year sale leaseback.   The two-year older Ferguson location wasn’t sold to an investor, so no deductions. The 1.14 acre site was too small to build a new QuikTrip.  So they opened a new location a mile and a half north at 10768 W. Florissant Ave. on 3+ acres.

It was either the night of the shooting, August 9th, or the next night when the older QuikTrip was burned that QuikTrip Board Member Michael Johnson called the Urban League’s Michael McMillan to offer to donate the property. I can’t blame them — they probably had wanted to close the location anyway. So began the six month process involving corporate CEOs and heavy hitters collectives like Civic Progress.

A few misunderstood my point a week ago — involving the public or at least respecting the plans the public helped draft  — isn’t an “either or” situation. They could’ve done exactly as they did but announced this building will represent the new W. Florissant Ave with a up to the sidewalk design to respond to the needs of the high pedestrian population. Instead they just decided to put the new building where the old building was.

St  Louis County records list the irregularly-shaped property as being 1.14 acres.
The building was located on the East edge of the site, set back from W. Florissant and Northwinds Estate Drive
QuikTrip never made added an accessible route to the entrance, as required by the ADA
QuikTrip never made added an accessible route to the entrance, as required by the ADA
The North side is the easiest to meet the one route minimum, but most pedestrians will come from W, Florissant.
The North side is the easiest to meet the one route minimum, but most pedestrians will come from W, Florissant.

Locating the building at the street corner would make access from the sidewalk easy. Keeping the building at the back will require a circuitous route(s) — not pedestrian-friendly. Bare minimum — not empowering!

Additionally, if the Urban League builds at the back of the lot behind parking it’ll be difficult to convince others along W. Florissant Ave  to rebuild in an urban manner — effectively killing an important part of the plan. The St. Louis region is known for developing plans that sit on the shelf and collect dust — now we’re killing plans through willful ignorance.

When I asked during the press conference about why the building wasn’t up to the sidewalk Mike McMillian, said “remediation.” I guess that means QuikTrip isn’t remediating the contamination enough to build over the old tank location, but even that doesn’t make sense.   To remediate the site enough for residential use would be onerous — but a commercial building should be able to be constructed after the tanks are removed and basic remediation has been completed. I think they simply failed to consider the pedestrian population of Ferguson.

Nothing is built yet — the site isn’t ready yet. I hope they’ll do the right thing and work to set a good example for future buildings this stretch of W. Florissant.

— Steve Patterson

 

Half Of Readers: Ferguson’s Mayor Should Not Resign

Only one person selected “maybe” in the Sunday Poll — that person was me. I think Knowles‘ time to resign was 5-6 months ago — to fall on his sword — to clear out the old guard leadership so real change can begin. Now I hope the recall effort is successful.

Here are the poll results:

Q: Should Ferguson Mayor James Knowles resign?

  1. No 21 [50%]
  2. Yes 14 [33.33%]
  3. Unsure/No Opinion 6 [14.29%]
  4. Maybe 1 [2.38%]

Last Fall Knowles didn’t think problems existed in the Ferguson Police Department — his employer for 4 years, but the DOJ has shown otherwise. For Ferguson’s new political activists I think it’ll be much more rewarding if he’s recalled by voters than if he were to resign as others have. Conversely, if he survives the recall it’ll be a blow to those trying to bring change.

Ferguson has a Council-Manager form of government, the mayor’s annual salary is only $4,200.

— Steve Patterson

 

Two Community Plans Intersect at Former Ferguson QuikTrip Site

Before Michael Brown was shot & killed last August, community planning had been completed to improve parts of Ferguson & neighboring municipalities. In 2011 Great Rivers Greenway District completed the Maline Greenway Concept Plan, in June 2014 East-West Gateway Council of Governments completed the West Florissant Avenue Great Streets Master Plan — both included extensive community participation along their linear boundaries.

The boundaries of each plan, coincidentally, intersect at the burnt out QuikTrip (9420 W. Florissant Ave). The 1.14 acre site, on W. Florissant Ave, is bordered by Maline Creek on the South. Next week I’ll post about the Urban League’s intentions for this site and how they ignored two published plans with extensive community involvement. Today more detail on both plans.

West Florissant Avenue Great Streets Master Plan:

The Vision for West Florissant Avenue comes from community and stakeholder input received through multi-faceted outreach efforts. These have included public workshops and virtual walking tours, interviews with community leaders, input from the Community Committee and Technical Advisory Committee, an Agency workshop, and an online survey and mapping tool. The Vision Statement has distilled this community and stakeholder input, with the most significant community values expressed as how the corridor should look, feel, and contribute to the community’s future. 

Maline Greenway Concept Plan:

The Maline Greenway Concept plan presents the findings of a yearlong planning process that involved inventory, analysis and recommendations. Input from residents within communities along
the greenway helped shape the plan. The report includes background information on the District, summary of existing conditions, review of public input, description of the Maline Greenway concept, implementation overview and a summary of recommendations that include not only the trail alignment opportunities but also recommendations that address the social, economic and environmental quality of life for the communities. The Concept Plan helps to guide partnership opportunities, provides an analysis of the corridor, identifies community connections and alignment opportunities.

The West side of W. Florissant is very similar to the East. lots and lots of paving
The West side of W. Florissant is very similar to the East. lots and lots of paving. August 2014

From the Existing Conditions chapter of the West Florissant Ave plan, p20:

Ferguson’s zoning was updated as recently as 2011 and includes a downtown form-based code. Ferguson’s guiding comprehensive plan document is the Vision 2015 Plan Update that dates to 1998.

Page 24:

Although sidewalks are provided on both sides of West Florissant Avenue along most of the corridor, the pedestrian realm is generally uninviting and often unsafe. Buildings are spaced too far apart to walk, sidewalks are interrupted by frequent driveways and parking entries, and there are few pedestrian amenities or street trees.

Page 25 talks about transit and possible Bus Rapid Transit (BRT):

West Florissant also carries transit, specifically MetroBus Route 74 (Florissant line), and though the headways are long (30 minutes), Route 74 is one of Metro’s heaviest-used lines, with over 1.1 million boardings in 2013. West Florissant is crossed by MetroBus Route 61 (also in Metro’s top ten heaviest-used routes, with 800,000 boardings) at Chambers Road. The heavy transit use along the corridor results in a correspondingly heavy pedestrian demand. There is a clear opportunity to encourage transit- and pedestrian-oriented development at this intersection of West Florissant and Chambers Road.

While the current roadway configuration works relatively well for those traveling by automobile, and offers a transit option, other modes and users are largely shortchanged. West Florissant Avenue’s auto-dominated character and design, width, and traffic speeds, as well as the lack of any bicycle facilities, make it hostile to and unsafe for cyclists. Conditions for pedestrians are somewhat better, with the presence of sidewalks, but the pedestrian experience in many places along the corridor is unpleasant and unsafe.

With new high-quality transit service given priority along the corridor, and with rush-hour headways of 10 minutes, the opportunity exists to remake West Florissant Avenue into
a transit-first street, with transit-oriented, pedestrian-scale development clustered around some key stations along the corridor. The corridor has a relatively wide right-of-way, which will make allocating space efficiently to serve the multi-modal needs of all its users easier than if the street were narrower.

Chapter 5 Concept Plan, page 86:

New infill development should be guided by new zoning and guidelines that require buildings and entrances to be built up to the sidewalk, forming a consistent street wall. Until redevelopment occurs, individual property owners should be encouraged to beautify the edges of existing parking lots that front the avenue, so that the pedestrian experience is improved.

The study area of West Florissant Ave is long, but you have to start somewhere. From the Executive Summary:

Project construction should start at the south end, where there is high potential for redevelopment projects such as new housing, retail and mixed use projects. Thus investing public funds in this zone first follows a strategy that looks to catalyze private investment as soon as possible. Maline Creek is also planned to be reconstructed, so developers will be attracted to the critical mass of activity which will result in an appealing place for housing to be developed. Putting the South Gateway into construction in the first phase will also help create a rationale for the street design and use of medians and access management, simply because these street treatments are already in place immediately to the south, at Buzz-Westfall Plaza.

Maline Creek was identified as the point where the commercial development stops and residential begins, the former QuikTrip is on the residential side of Maline Creek.

Looking East at Maline Creek from West Florissant, the QT site on the left.
Looking East at Maline Creek from West Florissant, the QT site on the left. August 2014

From the Maline Creek Greenway Concept Plan Executive Summary:

Numerous park and open space areas exist along the proposed Maline Creek corridor which could potentially function as trailheads and Greenway amenities. Creating attractive linkages between parks and open spaces will promote public use and create the opportunity for the greenway to become a regional attraction. (p1.5)

After the trail leaves Ferguson’s Forestwood Park

Continuing east, the trail is planned to be located in open space at the north side of Maline Creek to West Florissant Avenue. From West Florissant Avenue the trail is planned to proceed south across the creek and then go east on the south side of the creek for approximately 2000 feet. A pedestrian bridge is planned in this area to cross the Maline Creek to reach the north side open space and continue east to Lucas and Hunt Road near Westview Middle School (p1.9)

The QuikTrip site could, perhaps, allow the trail to stay on the North side of Maline Creek.

In the interest of transparency and community involvement I think the community should share in setting the vision for the use of 9420 W. Florissant Ave. More next week.

— Steve Patterson

 

Sunday Poll: Should Ferguson Mayor James Knowles Resign?

Please vote in the poll, located in the right sidebar
Please vote in the poll, located in the right sidebar

Ferguson Mayor James Knowles, running unopposed, was reelected to a second 3-year term in April 2014.  Much has changed in the year since — following the recent Dept of Justice report we had the resignations of the city manager, municipal judge, police chief, and others.

Some feel Knowles should also resign, they’ve started a recall campaign:

Five residents notified city hall that they had formed a committee to gather signatures to force a recall election, the first step in a removal process outlined in the city’s charter. It appears the group would have 60 days to gather roughly 1,800 signatures, about 15 percent of the number of people who were eligible to vote in the last mayoral election. (Post-Dispatch)

So I ask the question: should he resign?  The Sunday Poll is at the top of the right sidebar and is open until 8pm tonight.

— Steve Patterson

 

Advertisement



[custom-facebook-feed]

Archives

Categories

Advertisement


Subscribe